Embed

portal links

Top Row

Campus Construction

The Cupertino campus has been enhanced by several recent construction projects, funded by Measures K, B and CC. This includes the construction of a new student union in 2013 - a two-story building that houses guidance and staff offices, cafeteria, library, several classrooms and an outdoor terrance. Site work also included a new quad, drop off area and new landscaping and paving.

In 2017, construction was completed  on a beautiful new two-story classroom and science building housing 22 classrooms, a Career Technical Education lab and six state-of-the-art science classrooms. The building is connected via walkways and arranged around an outdoor courtyard that serves as an ideal space for collaboration. Sustainably designed, the building features ample daylighting, high-efficiency mechanical systems and environmentally responsive materials.