Campus Construction

Construction was completed in 2017 on a beautiful new two-story classroom and science building on the Cupertino High School campus. The building houses 22 classrooms, a Career Technical Education lab and six state-of-the-art science classrooms, and is connected via walkways and arranged around an outdoor courtyard that serves as an ideal space for collaboration. Sustainably designed, the building features ample daylighting, high-efficiency mechanical systems and environmentally responsive materials.

A new student union was completed in December 2013. The two-story building houses guidance and staff offices and the cafe, food court and kitchen on the first floor. The second floor consists of a library with classrooms, offices and an outdoor terrace. Site work also included a new quad, drop off area and new landscaping and paving.